• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Eyemouth Harbour Trust

Eyemouth Harbour Trust

Scotland's first port of call...

  • Location
    • Access & Facilities
    • Navigation
    • Arriving at Eyemouth: visiting vessels
  • About the Harbour
    • Brief History
    • The Harbour Trust
      • Meet our Trustees
      • Meet the Team
    • Notices to Mariners
    • Port Marine Safety Code
      • Port Waste Management Plan
      • Marine Safety Plan
      • Oil Spill Contingency Plan
    • Working at Eyemouth Harbour [contractors]
    • Harbour Projects
    • Protecting the Marine Environment
    • Office Facilities
    • Gallery
    • Videos
  • Marine Sectors
    • Fishing
      • Ice production facility
    • Leisure Craft
    • Offshore Wind
    • Cruise
    • Leisure Activities
  • News & Events
  • Surrounding Area
  • Contact Us

Offshore Wind Sector

Eyemouth Harbour is actively pursuing opportunities for diversification into the offshore wind industry. It is ideally located, being close to a number of the North Sea’s offshore wind development sites, including EDF Renewables’  ‘Neart na Gaoithe’ project and Seagreen’s ‘Firth of Forth’ site.

Eyemouth Harbour Trust enthusiastically supports the offshore wind industry, we are members of Scottish Renewables and NnG (Neart na Gaoithe) Offshore Wind Farm Coalition so can be seen at a number of key industry events, such as All-Energy and Scottish Renewables’ Offshore Wind events.  To date, vessels operating in the Neart na Gaoithe offshore wind site have made use of the short sailing distance from Eyemouth for early survey work.

4C Offshore – are a leading information resource of choice for the offshore industry – click this link for further information and to see our page.

Scottish Energy Ports Directory – for further information and to see our page click here

Below is a summary of the many excellent advantages we can offer to the offshore wind industry:

Eyemouth Harbour facilities & services for the Offshore Wind Industry:
24/7 unrestricted access for vessels with up to 2m draught
  • Lock-free/ tide does not affect vessel access
  • Gunsgreen Basin: max depth 6.2 m, min depth 2.9 m
  • Gunsgreen Basin: 280m of berthing quay
  • Vessels up to 40m LOA
Port closures only in extreme weather conditions
  • Closures only occur in severe weather conditions – Gale Force 8 north/ north easterly + heavy swell
Unrestricted access to deepwater berth and no conflict with existing port traffic
  • Segregation between commercial and leisure traffic (leisure vessels berth in inner basin on pontoon away from deep water area)
Land is available for development
  • At the quayside and adjacent to the harbour

  • Full planning consent in place for a helicopter facility
    Modern office facilities available
    • At quayside and adjacent to the harbour
    Eyemouth Harbour offers services to meet the needs of commercial and leisure vessels
    • Engineering, repairs and maintenance – local boat repair yard, Eyemouth Marine Ltd located at the harbour
    • Re-fuelling facility (54,000-litre gasoil tank)
    • Electricity, fresh water, telecommunications

    • Slipway and facility for ship repair/ launch
    • Showers, WC and Laundry Facilities

    • 200 kg unloading winch and davit crane
    • Training facilities for equipment operators
    • Chandlery/ stores
    Dedicated access road avoiding town centre and residential areas
    • Unlike many small fishing and leisure harbours there is a dedicated road directly to the harbour avoiding narrow and congested town centre streets and residential areas
    Easy and quick connections to key transport networks and conurbations
    • London to Eyemouth Harbour in under four hours by rail – hourly service between Kings Cross and Berwick
    • 45 minutes by rail to Edinburgh and Newcastle city centres
    • Close proximity to A1, the main north–south road link
    • 1.5 hours from Edinburgh and Newcastle airports by road
    Close proximity to offshore wind and other development locations
    • Eyemouth Harbour is in close proximity to almost all Firth of Forth Phases 2 & 3 site segments, Neart na Gaoithe and Inch Cape
    Skilled workforce ready to mobilise
    • Electrical, mechanical, engineering, plumbing, welders
    • Mariners – ex-fishermen are already working in the renewable energy sector
    • Training – Bell Training Services, Berwick upon Tweed (www.belltrainingservices.co.uk/) offers a wide range of technical and machinery related training

     

    Primary Sidebar

    Site Search

    Latest News & Events

    Annual General Meeting

    Eyemouth Harbour Annual General Meeting The Annual General Meeting of Eyemouth Harbour Trust will be held on … [Read More...] about Annual General Meeting

    View more news & events...

    Follow us on:

    Facebook Twitter Instagram

    Footer

    Location
    About the Harbour
    Access & Facilities
    News & Events
    Surrounding Area
    Contact Us

    Follow us on:

    • Facebook
    • Instagram
    • Twitter
    • Vimeo
    Privacy and Policies Copyright © 2025 Eyemouth Harbour Trust
    Harbour Office, Gunsgreen Basin, Eyemouth, TD14 5SD • Tel: 01890 752494